On my trip to the site Sunday, I noted: concrete has been poured for the rear walkways between the buildings; carpeting has been installed in the Kidstown auditorium and in some of the classrooms; drywall is being installed in the Cafe'; bolts have been installed in the floor of the sanctuary to secure the seating; bars have been erected in the ceiling of the sanctuary to hold the stage lighting; and the bricked planters have been erected at the entrance to the sanctuary building.
Tuesday, November 15, 2011
11/13/11
On my trip to the site Sunday, I noted: concrete has been poured for the rear walkways between the buildings; carpeting has been installed in the Kidstown auditorium and in some of the classrooms; drywall is being installed in the Cafe'; bolts have been installed in the floor of the sanctuary to secure the seating; bars have been erected in the ceiling of the sanctuary to hold the stage lighting; and the bricked planters have been erected at the entrance to the sanctuary building.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment