Made a quick run by the site this morning. The place was covered in workers and supervisors. A lot of action. Things I saw included planting of trees, installation of sod, concrete pouring and grading. They are building what looks like two raised flower/planting beds in front of the sanctuary (like we used to have in front of the building years ago. A gentleman was erecting a sign behind the multi-purpose building (what I have been calling the Youth/Genesis bldg). They are installing what looks to be acoustical insulation to the back walls of the sanctuary. Drywall is being installed for a ceiling in the hallways of the sanctuary building. Oh Me Oh My!!
Thursday, November 10, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment