Had an afternoon off of work, so I decided to visit the site today. Wow. You would not believe the things that have happened since Saturday. They are installing cabinets in the pre-school classrooms and work areas. They are installing the metal frames for the stage in Kidstown auditorium. They are installing the roof over the walkways behind the sanctuary leading to the other two buildings. Drywall is going up in the hallways of the Sanctuary building and inside the sanctuary itself the last of the HVAC piping is up. Oooohhh, and the air conditioning was running in the Pre-school building. Have a look!
Wednesday, August 31, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment