Made it over to the site after Men's Breakfast this morning. Many things to report on. Much more has happened then space or time will allow here. Just say, they are trying really hard to make a deadline. It shows. Here's the rundown of what I saw today: Work is progressing on installing the wood over the entrances to Kidstown/Pre-school and the Sanctuary. A clear roof has been installed over the patio area between the Sanctuary and Kidstown. The projector screen and ceiling lights are installed in the Kidstown auditorium. Framing is going up in the Cafe' and for the backdrop behind the welcome booth in the Sanctuary foyer. Framing to hold the acoustical ceiling is going up in the hallways of the Sanctuary. In the Sanctuary, the wood underlaying for the floor of the stage is in. The walls are starting to go up for the sound booth in the sanctuary. The drywall facing has been put in over the baptistery. And the huge stage is being erected in the Youth/Genesis building. Take a look!
Saturday, October 15, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment