Saturday, July 23, 2011

07/23/11






























































A lot of progress to report on today. The green metal roofing is being installed on the Genesis/Youth building. The columns are bricked in the patio area between the sanctuary and Kidstown/Pre-school building. The bricking of the front of the sanctuary building is progressing. Installation of black acoustical tiles is underway in the sanctuary ceiling. And windows are being installed in the Kidstown/Pre-school building.

No comments:

Post a Comment