Today I noticed that they are ready to pour the concrete floor in the Genesis/Youth bldg. Metal framing continues to go up on the sanctuary building. Steel beams have been installed in the upper tier of the stadium seating. Most obvious, the back parking lot has been paved. This is a move to save some money now, as oil prices (asphalt has oil in it) continues to rise. And on the display area at the entrance to the site you can now see how the brick facing will look.
Saturday, April 30, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment