Saturday, March 19, 2011

03/19/11







A beehive of activity today. The contractors are installing metal framing in the Pre-school/Kidstown building. The concrete floor has been poured on the front right third of the main building. The lobby and left front flooring have been prepped for concrete to be poured. And more steel has been hung on the Youth/Genesis building.

2 comments:

  1. Pat, great pics! You are doing a super job, and it's nice to see the progress!
    -Monte

    ReplyDelete